Making sure you have the right volume before you order concrete saves time and money and avoids the possibility of running out just when you need it most.

Measure Length and Width First

Measuring Length & Width of a Concrete Pour in Meters.

Convert Depth Into Metres

When measuring the depth of a slab be sure to convert the height from millimeters to meters. A 100mm slab is 0.1m high and a 150mm slab is 0.15m high. Make sure to convert the height before doing any calculations as the numbers can increase drastically.

Apply the Core Formula

So for a 4m x 3m slab at 100mm depth you would require 1.2 cubic meters of concrete.

Add Five to Ten Per Cent for Wastage

Uneven ground, spillages and an overgenerous pour all add up to more concrete than you calculated. A further 10% should be added to cover all these problems when ordering ready-mix concrete in the Cheltenham area for a driveway or garage floor. For Concrete Cheltenham, see https://www.monstermixconcrete.co.uk/concrete-cheltenham/.

Handle Irregular Shapes in Sections

For irregular shapes such as L shaped areas it is best to work out the volume of each section and then add them all together. This may take an extra minute but it ensures you have an accurate total volume.

A little time spent planning and calculating before you order the concrete for your pour will mean that your pour goes smoothly and you won’t be left waiting for supplies on the day.